How do you apply for the Forschungszulage in 2026?
What the video says
The Forschungszulage reimburses 25 to 35% of your research and development costs. You apply in two stages. First, the certification body for the Forschungszulage, BSFZ for short, checks whether your project counts as research and development. Then the tax office sets the allowance based on your actual costs.
In the BSFZ application, you describe your project along three criteria: What is technically new compared to the state of the art? Where is the technical risk? And how do you proceed in a planned way?
The application is read by technical reviewers, often engineers and former heads of research. So write for engineers, not for marketing.
The BSFZ only checks your costs for plausibility. So estimate generously: the tax office looks at the details later.
After about two months, the certificate arrives. It covers the whole project, even retroactively for up to four years. And if something is missing, you can amend it.
With the certificate, you then apply to the tax office via ELSTER for each financial year, filed by your tax advisor. Now evidence counts: salaries, timesheets, contracts. The allowance is offset against your taxes or paid out.
With Zeitmaker, you get more out of it. On average, we find 25% more eligible costs than self-filed applications. 95% of our applications are certified, compared with only 79% across all BSFZ applications (evaluation report on the Forschungszulage act, BT-Drs. 21/7999). So your chances are much better with us. Our own software keeps the effort for your team low and always shows you where your application stands. And behind it is the experience from more than 100 submitted projects.
Overview: the Forschungszulage application
Phase 1 · BSFZ certificate
As early as possible, so all past costs can be counted.
- 01Identify R&D projects
Check eligibility against the three criteria: novelty, risk, systematic approach.
- 02Submit BSFZ application
Submit project descriptions via the BSFZ portal using an ELSTER certificate.
- 03Technical review
Distribution to review institutes (DLR, VDI, AiF). Engineers and programmers assess.
- 04Certificate
After a positive review you receive the BSFZ certificate. Binding for the tax office.
Phase 2 · Tax office filing
After the end of the fiscal year in which the costs arose.
- 05Tax office application
Application via the ELSTER portal (Mein ELSTER) for each fiscal year separately, pre-filled by Zeitmaker, reviewed and filed by your tax advisor.
- 06Detailed review
Gross salaries, timesheets, employment contracts, assessment basis.
- 07Assessment notice
After a successful review you receive the assessment notice.
- 08Payout
Offset against income tax or paid out as a surplus.
Why our applications are traceable
- Our own software pipeline for R&D documentation
- Timesheets, project allocation and supporting documents are captured in a structured way and remain complete and traceable at any time — not reconstructed after the tax office asks.
- Developers with application and audit experience
- We know the questions the tax office and auditors ask, and prepare the figures and documents so your tax advisor can review them directly — technically precise, not stuffed with marketing buzzwords.
- Clean separation between BSFZ and tax-office worlds
- BSFZ checks technology for plausibility, the tax office reviews money in detail. We build the documentation so both reviews draw from the same source, and pre-fill the ELSTER form for your tax advisor straight from the BSFZ documentation, with no contradictions between certificate and ELSTER filing.
- Groundwork for your tax advisor
- Your tax advisor receives the actual hours and costs per fiscal year, a pre-filled ELSTER form and our assessment, subject to their final review. They review and file and handle the communication with the tax office, so you don't need to learn the review guideline by heart.
Who reviews your application? The certification body (BSFZ)
The BSFZ is the central body for the technical review of R&D projects.§ 6 FZulG§ 6 FZulG: Die Bescheinigungsstelle Forschungszulage (BSFZ) stellt für jedes Vorhaben mit Begründung fest, ob es die FuE-Voraussetzungen des § 2 FZulG erfüllt. Die Bescheinigung ist Grundlage für die Festsetzung. Über die Forschungszulage selbst entscheidet erst der Bescheid des Finanzamts. It receives applications via its online portal and distributes them to specialised institutes for assessment (DLR, VDI, AiF).
You cannot influence which institute reviews your application. Processing time varies depending on the institute and workload. If information is incomplete, you will receive a request for additional information — typically only one chance to respond.Prüfleitfaden Ch. 1.1.4Prüfleitfaden Ch. 1.1.4: „Sind Angaben zu den drei Kriterien erkennbar fehlerhaft oder unvollständig, wird den antragstellenden Unternehmen schriftlich die Möglichkeit gegeben, innerhalb einer angemessenen Frist Angaben zu ergänzen oder zu vervollständigen (Nachforderung). Ist mindestens ein Kriterium unabhängig von einer etwaigen Nachforderung unzweifelhaft nicht erfüllt, wird zu den anderen Kriterien keine Nachforderung gestellt.“ For amendment applications, processing is typically much faster than for initial applications.
Who reads your application? Former research directors and engineers
Your application is not read by administrators, but by technical experts with engineering backgrounds: former heads of research, engineers, programmers, and natural scientists. They assess based on the official review guideline whether your project meets the three R&D criteria.Prüfleitfaden Ch. 1Prüfleitfaden Ch. 1: „Jeder Forschungs- und Entwicklungsprozess besteht aus drei wesentlichen Teilen: Start/Ausgangslage, Weg zur Umsetzung, Ziel: Produkt, Verfahren oder Dienstleistung.“
This means: Write for engineers, not for managers. General or marketing-oriented descriptions like "innovative product" or "more revenue" will not convince the reviewers. They want to know specifically: What is the current state of the art? What exactly is technically new about it? What scientific or technical risk exists?Prüfleitfaden Ch. 1.1.2Prüfleitfaden Ch. 1.1.2: „Die BSFZ bezieht sich bei der Bewertung des Kriteriums Unwägbarkeit / Risiko ausschließlich auf wissenschaftliche und technische Aspekte. Wirtschaftliche Risiken und Unwägbarkeiten werden zur Beurteilung, ob ein FuE-Vorhaben im Sinne des FZulG vorliegt, nicht herangezogen.“
How is my application reviewed?
The reviewers work according to the official BSFZ Review Guideline — the central document that defines what qualifies as R&D and what does not.
The BSFZ reviews each project against three criteria§ 2 FZulG§ 2 FZulG: Begünstigt sind Vorhaben der Grundlagenforschung, industriellen Forschung und experimentellen Entwicklung, eigenbetrieblich, als Auftragsforschung oder in Kooperation. Nicht mehr begünstigt sind Tätigkeiten, deren primäres Ziel die Marktentwicklung ist oder die ein festgelegtes Produktionssystem zum reibungslosen Funktionieren bringen sollen.. All three must be met. A detailed explanation can be found in the Requirements guide — here is the reviewers' perspective.
Not every activity is automatically eligible — the BSFZ clearly defines in its review guideline what can be certified and what cannot§ 2 (2) FZulG. The eligible phase ends, for example, already with the test of a prototype.Prüfleitfaden Ch. 2.1.2Prüfleitfaden Ch. 2.1.2: „Dazu zählen unter anderem Tätigkeiten, die primär auf die Marktentwicklung eines im Wesentlichen festgelegten Produktes oder Verfahrens abzielen oder zum Ziel haben, ein Produktionssystem zum reibungslosen Funktionieren zu bringen. Die FuE-Phase endet mit dem Test eines Prototyps.“
A negative outcome is not the end of the road: within one month of the decision you can file an objection with the BSFZ or resubmit the project in a revised form.
Costs in the application: how the BSFZ plausibility check works
An important distinction: The BSFZ only checks your cost estimates for plausibility, not in detail.Prüfleitfaden Ch. 1.2Prüfleitfaden Ch. 1.2: „Bezogen auf die Angaben zum finanziellen und personellen Rahmen wird durch die BSFZ eine Plausibilitätsprüfung „dem Grunde nach“ durchgeführt. Mangelnde Plausibilität liegt vor, wenn die Angaben des antragstellenden Unternehmens zum personellen Aufwand und/oder zu den Auftragskosten grob unschlüssig, widersprüchlich oder fehlerhaft sind.“ They check whether the information on personnel effort and costs is generally plausible — not whether every number is exactly correct.
What the BSFZ would flag as implausible: if an e-commerce company states that 100% of employees exclusively perform R&D. But if a technology company declares 20–30% of its personnel costs as R&D, that is understandable.
Estimate generously rather than conservatively. The detailed review only happens at the tax office — and there it is easier to approve less than to increase the amount retroactively.
Timing: when should you apply?
The Forschungszulage can be applied for up to four years retroactively§ 12 FZulG§ 12 FZulG: Für die Forschungszulage gelten die Vorschriften der Abgabenordnung für Steuervergütungen. Daraus folgt die vierjährige Festsetzungsfrist (§ 169 AO): Der Antrag beim Finanzamt ist in der Regel bis zu vier Jahre nach Ablauf des Jahres möglich, in dem der Anspruch entstanden ist.. This makes it fundamentally different from traditional funding programmes.
Recommended strategy:
- Apply 1–2 years retroactively — for already completed project phases
- Include the current year in your plan
- Only plan ahead as far as you have reliable projections
The major advantage of retroactive application: you already know what was actually researched. No elaborate reporting, no deviations from the original plan.
Retroactive or advance application?
The BSFZ certificate covers the entire project — including its full duration. The tax office application is submitted separately per fiscal year. So you use the same BSFZ certificate for multiple tax office applications.
Retroactively for multiple years at once— You apply for the BSFZ certificate for a project and then submit a separate tax office application for each past fiscal year. This is the most efficient approach because you know exactly what R&D expenditures were actually incurred.
Annually with the same certificate — You obtain the BSFZ certificate once and then submit the tax office application each year after the fiscal year ends.
In practice, a combination has proven effective: cover 1–2 years retroactively plus the current year with the initial application, then submit the tax office application annually for the completed fiscal year going forward.
Can the application be changed after submission?
At the BSFZ: yes, but it requires effort. As long as the BSFZ is still processing the application or has already issued the certificate, you can submit an amendment application. Processing time for amendment applications is typically shorter than for initial applications.
At the tax office: only to a limited extent. Once the Forschungszulage application has been submitted, a correction is only possible under the tax rules for amending assessments, which your tax advisor clarifies. That is why a careful check against the BSFZ certificate beforehand pays off. If something changes about your project after the BSFZ certificate has been issued, you must first submit the amendment application to the BSFZ and wait for the new certificate.
Three practical tips for a predictable application
- Make the criteria verifiable, not just describable. Answer three questions concretely for every project: What is technically new compared with the state of the art? What cannot be solved with certainty, and where could it fail? Which work plan and milestones do you follow? Rollouts, operations without knowledge gain and market research do not belong in the R&D core.
- Delineate costs early.The typical mistakes: R&D time not separated from routine and support work, time tracking that is too coarse ("20% flat" without a rationale), external services classified incorrectly (freelancers or temporary staff instead of contract research) or costs booked to the wrong financial year. A simple cost map helps: which roles work on the project, which work packages form the R&D core, and which evidence exists for each work package?
- Plan both stages with roles and lead time. The BSFZ certificate is driven by text, the tax office application by figures and evidence. Decide who is responsible for what (project owner, finance, tax advisor), allow lead time for texts, documents and queries, and keep the deadlines per financial year in view, especially for retroactive projects.
Forschungszulage at the tax office: the application via ELSTER
After receiving the BSFZ certificate, you submit the application to the responsible tax office via Mein ELSTER§ 5 FZulG§ 5 FZulG: Der Antrag auf Forschungszulage wird nach Ablauf des Wirtschaftsjahres, in dem die förderfähigen Aufwendungen entstanden sind, elektronisch beim zuständigen Finanzamt gestellt. Vorhaben und Aufwendungen sind so genau zu bezeichnen, dass eine Überprüfung möglich ist. Für jedes Vorhaben ist eine BSFZ-Bescheinigung nach § 6 FZulG erforderlich.. This is where it gets concrete — the tax office reviews the actual expenditures in detail:
- Gross salaries of employees involved in the R&D project
- Timesheets as proof of actual R&D working hours
- Employment contracts to verify the employment relationships
- Invoices for contract research and capital goods
- Correct calculation of the assessment basis and compliance with caps
The project must essentially be the same one described to the BSFZ. Tax audits do occur — especially for larger funding amounts. Clean documentation from the start is therefore essential.
Forschungszulage vs. traditional funding programmes
If you have experience with ZIM, BMBF programmes, or EU project funding, you know the typical process: submit a project application before starting, write interim reports, have milestones reviewed — and in the end, explain why the project turned out differently than planned. The Forschungszulage application process is fundamentally different.
Application timing
Up to 4 years retroactively possible
Before the project starts
Legal entitlement
Yes — no competition for budgets
No — limited budgets, competition for funding
Industry/topic
Completely open
Topic- or industry-specific calls
Reporting during the project
None — documentation only
Interim reports, milestones, proof of use
Processing time
BSFZ ~ 2 months
Often 6–12 months until approval
Payout
Via the tax assessment
After proof of use, often pro-rata
The biggest practical difference: with traditional funding, ongoing reporting is the pain point. With the Forschungszulage, you describe retroactively what actually happened — no explaining deviations from the plan, no follow-up reporting. But the quality of the BSFZ application becomes the decisive factor.
Our approach vs. typical consultants
- Developer who builds own software pipeline
- Understands your tech without translation
- One short conversation with your CTO
- Application written at expert level
- Finance or funding background
- Your CTO writes the technical part
- Hours of back-and-forth explaining
- Generic application with buzzwords
The reviewers at the certification body are engineers, not funding officers. Drafting the application at expert level saves your CTO the translation work and spares the project the follow-up questions. Our Forschungszulage consulting describes what that looks like in practice.
FAQs on the application process
Want to maximise your funding?
We handle the entire BSFZ application and prepare the figures for the tax office application so your tax advisor can review and file them — your team only provides input.
Continue with the other guides
Three more compact guides on the Forschungszulage — pick whichever fits your next question.